Downtown Saint-Jean-sur-Richelieu

The five-year redevelopment project of downtown Saint-Jean-sur-Richelieu covered six distinct areas: the north and south entrances, the Gouin Bridge, the Rue Richelieu, the Promenade du Quai and the Vieux-Iberville.

The first phase of this $40 million revitalization project began with the rehabilitation of infrastructure; the burying of public utility networks; and the rehabilitation of roadways, sidewalks, parking lots, and crossings.

Bolduc Avenue pavers were the material chosen to cover part of the sidewalks and roadways on this major revitalization project.

Products used:  Avenue paver 10 x 15 x 30 cm, 10 x 30 x 30 cm